← All projects

Group reference experience

Kaniv Hydroelectric Power Plant

Reconstruction of the electrical part and hydro units, installation and commissioning of equipment.

Type
Modernization
Status
Completed
Years
2012–2021
Location
Ukraine
Role
Reconstruction & installation

Project gallery

Comprehensive modernization delivered in several stages: reconstruction of the electrical part of unit No. 6 (2012–2013); reconstruction of hydro units No. 2 and 3 — 8 generating sets (2014–2016) with replacement of electrical and hydraulic equipment and a new control system; installation and commissioning of two further units — 7 turbines and 7 generators together with Ukrainian Energy Machines (2017–2021); building repair works, deformation-seam repairs and replacement of the T4 power transformer.

Scope of works

  • reconstruction of hydro units No. 2, 3 and 6
  • new control system
  • installation of 7 turbines and 7 generators
  • T4 transformer replacement
  • building repair works

Functional storage is used as needed for language, your choice and a secure administrator session.

Google Analytics is not currently configured: analytics scripts and cookies do not load.

Cookie policy