HPP and PSPP construction, reconstruction and modernization projects involving the Ukrhidroenergobud Consortium.

Dniester Pumped Storage Power Plant
Stages I and II are complete, with four hydro units in operation. Since 2022, the Consortium has been building Stage III (units 5–7) as general contractor.
Group reference experience
Kaniv Hydroelectric Power Plant
Electrical reconstruction of Block 3 (units 9–12) and modernization of auxiliary systems for units 13–20.
Group reference experience
Dniester Hydroelectric Power Plant
Transformer delivery and reconstruction of the stone-earth dam cores.
Group reference experience
Kyiv Hydroelectric Power Plant and PSPP
Overhaul of unit covers and shutters, and anti-corrosion protection of the crane.
Group reference experience
Kakhovka Hydroelectric Power Plant
Supply and installation of new repair shutters and spillway dam gates.
Group reference experience
Seredniodniprovska Hydroelectric Power Plant
Manufacture and installation of the upper section of the main spillway gate.
Group reference experience
Kremenchuk Hydroelectric Power Plant
Nine sets (18 trash racks) for three hydro units. The contract was signed in 2018 and the work was completed in 2019.
Group reference experience
Dnipro-1 Hydroelectric Power Plant
Repair of concrete water-conduit surfaces and the spillway dam crossing.
Group reference experience
Tashlyk Pumped Storage Power Plant
Commissioning works that put stage I into operation — two 150 MW hydro units.